4/22/2020: Roadway Concrete Placed from Parkway to the West Entrance of the Gazebo

The new roadway concrete has been placed at the section from Parkway to the west entrance of the Gazebo. The view below shows the Sevierville History Museum to the left, Cash Hardware on the right, and the Sevierville Court House at the back, center of the photo.


The photo below shows crews placing concrete for the new sidewalk at the west entrance of the Gazebo parking area.


The video below provides a great perspective of the work being performed on Commerce Street. This work is providing new utility infrastructure - storm water, drinking water, sewer lines, gas, electric, and communication lines - which are critical components of keeping our downtown area "future-ready" for existing and new businesses